Skip to main content
Subcontracting Pro — Multi-Stage Job Work & Challans — A build-to-order ERPNext application for manufacturers who outsource m — 1/1Illustrative preview

A build-to-order ERPNext application for manufacturers who outsource multiple chained operations

— chained subcontracting stages, supplied-material and scrap reconciliation, per-vendor rate cards and SLAs, and country-specific job-work challans.

ECOSIRE builds it to your confirmed scope, installs it, and supports it.

What is Subcontracting Pro — Multi-Stage Job Work & Challans?

A build-to-order ERPNext application for manufacturers who outsource multiple chained operations — chained subcontracting stages, supplied-material and scrap reconciliation, per-vendor rate cards and SLAs, and country-specific job-work challans. ECOSIRE builds it to your confirmed scope, installs it, and supports it. Built to order by ECOSIRE for ERPNext v15, v16 — indicative price from $999.00 USD; request a quote for a scoped proposal.

Key Features

Chained multi-stage subcontracting: a `Subcontracting Stage` DocType links each outsourced operation to a parent job so stage N's output becomes stage N+1's supplied input automatically
Supplied-material reconciliation DocType that nets issued qty against returned finished goods, standard consumption, and declared scrap, posting adjustments via standard Stock Entries
Scrap and process-loss accounting with configurable tolerance thresholds per operation, flagging variances that exceed the allowed loss percentage
Country-specific job-work challan Print Formats (India GST Rule 45 / ITC-04-style delivery challans, plus configurable formats for other jurisdictions)
Per-vendor `Subcontractor Rate Card` DocType holding operation rates, minimum charges, and turnaround SLA days
Live WIP-at-subcontractor visibility: a report/dashboard of quantity and value currently held at each vendor per stage
`scheduler_events` daily job that flags jobs breaching their promised turnaround SLA and notifies the responsible role
`hooks.py` document events (`on_submit`, `on_cancel`) that keep stock ledger and GL entries consistent when reconciliations post or reverse
Whitelisted server-side methods exposed over the Frappe REST API to create jobs, advance stages, and query WIP status from external systems
Role profiles and DocType permissions (e.g. `Subcontracting Manager`) so only authorized users submit reconciliations or edit rate cards
Client scripts for in-form live calculation of expected consumption, scrap value, and net material owed as quantities are entered
Batch and serial-number carry-through across stages so traceability survives the full outsourced route
Landed-cost handling for subcontracting service charges and inbound freight, rolled into finished-good valuation
Upgrade-safe design: extends ERPNext native Subcontracting/Stock rather than overriding core, tested against Frappe/ERPNext v15 and v16

Built to order, done for you

No DIY setup — a working app, built, installed and supported by ECOSIRE.

  1. 1

    You order

    Start with a one-time build price. We scope it with you at kickoff.

  2. 2

    We build & install

    ECOSIRE builds, configures and installs it on your ERPNext.

  3. 3

    Go live + support

    You go live in about one working week, with two weeks of go-live support. Defects in the code we deliver are fixed free of charge.

Technical Specifications

ERPNext Compatibility
—
License
Licence confirmation required
Python Requirement
Python 3.10+
Database
MariaDB 10.6+

About this Product

If you outsource dyeing, plating, cutting, stitching, or PCB assembly, ERPNext's native Subcontracting works well for a single hand-off: one Subcontracting Order, one raw-material transfer, one receipt. But real outsourced routing is rarely one step. A greige fabric goes to a dyer, then to a printer, then to a stitching unit — and native ERPNext gives you no first-class way to chain those stages, to track work-in-progress sitting at vendor two while vendor one is already paid, or to reconcile the kilos you supplied against the kilos that came back plus the scrap that didn't. Finance ends up in spreadsheets, and the shop floor loses visibility of goods it still legally owns but can't see.

Subcontracting Pro is a proper Frappe application (its own module, installed via bench get-app and bench install-app) that extends ERPNext's manufacturing and stock domains rather than fighting them. We model each outsourced route as a chain of Subcontracting Stage DocTypes linked to a parent job, so the output of stage one becomes the supplied input of stage two automatically. A Supplied Material Reconciliation DocType nets issued quantity against returned finished goods, expected consumption, and declared scrap — with hooks.py on_submit doc events posting the resulting stock and value adjustments through standard Stock Entries so your inventory valuation and GL stay correct. Per-vendor Subcontractor Rate Card records hold operation rates and turnaround SLAs; a scheduler_events (cron/daily) job flags jobs that have breached their promised turnaround so nothing silently ages at a supplier.

On the technical side we build the way you'd build it yourself if you had the time: DocTypes with proper naming series and permissions, role profiles (for example a Subcontracting Manager role) so only the right people submit reconciliations, client scripts for the in-form calculations, and server scripts / whitelisted methods exposed over the Frappe REST API so your other systems can create jobs and pull WIP status programmatically. Country-specific job-work challans (India GST Rule 45 / ITC-04 style delivery challans, and configurable delivery-note formats for other jurisdictions) are generated as Frappe Print Formats you can brand and localize. Everything is native ERPNext — upgrade-safe, in your own bench, with no lock-in.

Because this is built to order, you are not downloading a generic marketplace app and hoping it fits. After a short scoping call we confirm your exact stages, reconciliation rules, challan format, and integrations, then build against your ERPNext version (v15 or v16). Typical delivery is one working week from confirmed scope. We deliver on a staging site for UAT first, hand over the full git repository and technical documentation, run a training session with your team, then install to production and support you through go-live and a defined post-launch window.

What you get

  • Installable source code for your version of the app (Frappe app installable via `bench get-app` / `bench install-app`), delivered as a private git repository you own
  • Installation and configuration on your ERPNext instance, including DocTypes, role profiles, naming series, and Print Formats
  • Technical documentation: DocType reference, hooks/server-script behavior, REST API endpoints, and scheduler job details
  • End-user guide plus a live training session for your operations and finance team
  • UAT on a staging site before production cutover, with a documented rollback plan
  • A defined post-go-live support window for fixes and questions after launch
  • Full git repository handover with commit history, README, and setup instructions — no lock-in
  • Configured country-specific challan Print Format(s) matched to your jurisdiction and branding

Who this is for

Textile manufacturer with multi-vendor routing

Runs greige through dyeing, printing, and stitching at separate subcontractors. Needs each stage chained, material reconciled kilo-for-kilo across the whole route, and GST job-work challans for goods moving between units.

Metal / fabrication shop outsourcing finishing

Sends parts out for plating, powder-coating, or heat treatment. Needs scrap and process-loss tolerances tracked per operation and clear visibility of value sitting at each vendor before paying service invoices.

Electronics / PCB assembler

Supplies components to a contract assembler and needs batch and serial traceability carried through the outsourced build, plus REST API hooks so the MES or procurement system can create jobs and pull WIP status.

Finance / compliance controller

Owns valuation accuracy and statutory job-work reporting. Needs reconciliation adjustments to post through standard Stock Entries and GL so inventory value and ITC-04-style returns reconcile without spreadsheets.

How Subcontracting Pro — Multi-Stage Job Work & Challans Compares

CriterionECOSIRECustom BuildCompetitorERPNext Native
Multi-stage chained job workBuilt-in: stages chained, output feeds next input automaticallyPossible but you design and build the chaining yourselfRare; most marketplace apps handle single hand-off onlyNo chaining concept; one order = one supplier step
Supplied-material reconciliationNetting DocType issued vs returned vs scrap, posts via Stock EntriesBuild from scratch and get valuation postings right yourselfUsually basic consumption tracking, limited scrap nettingManual; reconciliation lives in spreadsheets
Country-specific job-work challansConfigured Print Format for your jurisdiction (e.g. ITC-04-style)You author and maintain the Print FormatGeneric template, often India-only or not localizedStandard delivery note; no job-work challan format
Per-vendor rate cards & SLAsRate Card DocType with rates and turnaround SLA trackingDesign the model and SLA logic yourselfRarely included; rates usually per-order onlyNo rate card or SLA concept
WIP-at-subcontractor visibilityReport/dashboard of qty and value held per vendor per stageBuild the reporting yourselfLimited or absentVisible only via manual stock queries
SLA breach alertingDaily scheduler job flags breached turnarounds and notifiesBuild scheduler events and notifications yourselfTypically noneNone
Fit to your processBuilt to your confirmed scope, UAT on staging firstFully bespoke but you carry all build and QA riskTake it as-is; configuration limitedGeneric; adapt your process to the tool
Ownership & upgrade-safetyYou own the git repo; extends core, tested on v15/v16You own it, but upgrade-safety depends on your disciplineVendor-controlled; upgrade timing not yoursCore-safe but lacks the capability entirely

Frequently Asked Questions about Subcontracting Pro

How long does delivery take?

This is build-to-order, not an instant download. After a short scoping call to confirm your stages, reconciliation rules, challan format, and integrations, typical delivery is one working week from confirmed scope. We deliver to a staging site for UAT before any production cutover, so you validate before you go live.

How do support and updates work after go-live?

You receive a defined post-go-live support window for fixes and questions after launch, and you own the full git repository so nothing is locked away. Because the app is built to be upgrade-safe against Frappe/ERPNext v15 and v16, we can quote version-compatibility maintenance and enhancements as an ongoing arrangement after the initial window.

Which ERPNext versions do you support?

We build and test against Frappe/ERPNext v15 and v16. We confirm your exact version and bench setup during scoping and build against it, extending native Subcontracting and Stock rather than overriding core so future upgrades stay clean.

Isn't ERPNext's native subcontracting enough?

Native Subcontracting handles a single supplier hand-off well, but it has no first-class concept of chained multi-stage routes, no netting reconciliation of supplied material against scrap and returns, no per-vendor SLA tracking, and no country-specific job-work challan out of the box. Subcontracting Pro adds exactly those layers on top of the native flow.

Will this break when I upgrade ERPNext?

The app is a separate Frappe module that extends native DocTypes and uses documented hooks, server scripts, and scheduler events rather than patching core files. That is the upgrade-safe pattern. We test against v15 and v16, and version-compatibility checks can be part of an ongoing support arrangement.

Can it integrate with our other systems?

Yes. We expose whitelisted server-side methods over the Frappe REST API so external systems — an MES, procurement, or a supplier portal — can create jobs, advance stages, and query WIP status. Specific integration endpoints are agreed during scoping and documented on handover.

Do we own the code?

Yes. You receive the installable source as a private git repository with full commit history, README, and setup instructions. There is no lock-in — you can host, maintain, or extend it yourself, or continue with ECOSIRE for support.

Request a quote

Subcontracting Pro

A build-to-order ERPNext application for manufacturers who outsource multiple chained operations — chained subcontracting stages, supplied-material and scrap reconciliation, per-vendor rate cards and SLAs, and country-specific job-work challans. ECOSIRE builds it to your confirmed scope, installs it, and supports it.

  • Chained multi-stage subcontracting: a `Subcontracting Stage` DocType links each outsourced operation to a parent job so stage N's output becomes stage N+1's supplied input automatically
  • Supplied-material reconciliation DocType that nets issued qty against returned finished goods, standard consumption, and declared scrap, posting adjustments via standard Stock Entries
  • Scrap and process-loss accounting with configurable tolerance thresholds per operation, flagging variances that exceed the allowed loss percentage
  • Country-specific job-work challan Print Formats (India GST Rule 45 / ITC-04-style delivery challans, plus configurable formats for other jurisdictions)

Request a Quotation

Tell us about your Subcontracting Pro requirements and we'll send pricing, licensing options and a tailored proposal — usually within one business day.

No payment now. This sends a quote request to our team — we'll follow up by email with pricing and next steps.