Engineer-to-Order (ETO) Project Manufacturing — A project-driven engineer-to-order manufacturing layer for ERPNext that links — 1/1Illustrative preview

A project-driven engineer-to-order manufacturing layer for ERPNext that links each sales order to its engineered

BOMs, project budget, and milestone-based production in one flow.

ECOSIRE builds, installs, and supports it for your v15/v16 site after a quotation.

What is Engineer-to-Order (ETO) Project Manufacturing?

A project-driven engineer-to-order manufacturing layer for ERPNext that links each sales order to its engineered BOMs, project budget, and milestone-based production in one flow. ECOSIRE builds, installs, and supports it for your v15/v16 site after a quotation. Built to order by ECOSIRE for ERPNext v15, v16 — indicative price from $999.00 USD; request a quote for a scoped proposal.

Key Features

`ETO Project` DocType linking `Sales Order`, `Project`, engineered `BOM` tree, and a phase/milestone plan as one record
Progressive multi-level BOM and routing definition — engineering fleshes out each level as drawings release, without blocking the sales order
Live project budget-versus-actual for material and labor, kept in sync by server-side `validate`/`on_submit` doc events in `hooks.py`
`Change Order` DocType that versions the affected BOM and re-computes cost and schedule impact against the frozen baseline
Milestone-gated procurement — Material Requests and Work Orders for a phase are only released once the milestone is approved
Committed-cost rollup that aggregates open POs, work orders, and timesheets so managers see spend before it lands
Whitelisted API methods exposing ETO project state, budget, and change-order impact for PLM/CAD/reporting integrations over the Frappe REST API
Scheduler events that flag phases running over budget or past milestone dates and notify the assigned Project Manager
BOM-revision guard: doc events block releasing Work Orders against a superseded engineered BOM revision
Role profiles and permission rules for Project Manager, Engineer, Planner, and Procurement with submit-level control
Client scripts adding in-form phase pickers, budget gauges, and change-order impact previews
Phase-level cost baseline snapshots so original estimate, current forecast, and actual stay separately auditable
Project-driven serialization and asset handoff so the finished capital equipment ties back to its as-built BOM
Report views and dashboards for phase margin, change-order log, and milestone burn-down

Built to order, done for you

No DIY setup — a working app, built, installed and supported by ECOSIRE.

  1. 1

    You order

    Start with a one-time build price. We scope it with you at kickoff.

  2. 2

    We build & install

    ECOSIRE builds, configures and installs it on your ERPNext.

  3. 3

    Go live + support

    You go live in about one working week, with two weeks of go-live support. Defects in the code we deliver are fixed free of charge.

Technical Specifications

ERPNext Compatibility
—
License
Licence confirmation required
Python Requirement
Python 3.10+
Database
MariaDB 10.6+

About this Product

Custom machinery and capital-equipment builders live with a problem ERPNext core was never shaped for: every order is effectively a one-off project, the bill of materials does not exist yet when the sales order is signed, and cost is discovered progressively as engineering releases drawings. Out of the box, ERPNext gives you excellent Sales Order, BOM, Work Order, and Project DocTypes, but they sit in separate silos. There is no native link that says "this Project's budget is being consumed by these Work Orders against this engineered BOM revision," and no native way to see, at a milestone, whether a phase is running over on material or labor before the money is spent. Project managers end up reconciling this in spreadsheets, and change orders quietly erode margin because their cost and schedule impact is never rolled back into the project baseline.

ECOSIRE builds a proper Frappe app — its own module with versioned DocTypes, hooks.py doc events, and controlled migrations — that stitches these flows into one engineer-to-order backbone on your existing ERPNext site. We add an ETO Project layer that binds a Sales Order to a Project, a progressively-defined BOM/routing tree, and a phase/milestone plan. As engineering releases each phase, planners flesh out the next level of the BOM and operations; server-side validate and on_submit handlers keep the project's committed-cost rollup in sync so budget-versus-actual for material and labor is live, not a month-end exercise. A Change Order DocType captures scope deltas and, through whitelisted methods, re-computes the cost and schedule impact and versions the affected BOM so the original baseline stays intact and auditable. Milestone gates drive procurement and production release: material requests and work orders for a phase are only cut when the milestone is approved, using scheduler events to flag phases at risk and doc events to prevent releasing work against a superseded BOM revision.

Everything is delivered as clean, reviewable source in a git repository, with role profiles and permission rules (Project Manager, Engineer, Planner, Procurement) so each function sees and submits only what it should. Client scripts add the in-form UX — phase pickers, budget gauges, change-order impact previews — while the Frappe REST API and whitelisted methods expose the ETO project state to PLM, CAD, or reporting tools you already run. Because it is a native app and not a fork, it upgrades cleanly with ERPNext and targets both v15 and v16.

Build-to-order means exactly that: this is not an instant download. We start with a scoping call to map your ETO flow, quote a fixed scope, then build against it. Typical delivery is one working week from confirmed scope, ending with UAT on a staging site, a rollback plan, install and configuration on your instance, documentation, a training session, and a post-go-live support window. You own the source in your own repo.

What you get

  • Installable source code for your version of the app, delivered in your own git repository
  • Installation and configuration on your ERPNext instance (v15 or v16)
  • Technical documentation — DocType model, doc events, whitelisted methods, scheduler events, and permission design
  • End-user guide plus a live training session for project managers, engineers, and planners
  • UAT on a staging site with a documented rollback plan before production go-live
  • Post-go-live support window for defect fixes and configuration adjustments
  • Handover of the git repository with commit history and setup instructions
  • Role-profile and permission configuration matched to your ETO team structure

Who this is for

Project Manager, custom machinery builder

Owns delivery of one-off capital equipment and needs a single ERPNext view where the sales order, engineered BOM, project budget, and milestone plan stay reconciled — so margin erosion and slipping phases surface early, not at month-end.

Engineering / BOM manager

Releases the design progressively and needs to build up the multi-level BOM and routing phase by phase, version it under change orders, and stop production from consuming a superseded revision.

Procurement / planning lead

Wants long-lead material requests and work orders cut against approved milestones only, with committed cost visible against the phase budget before purchase orders are placed.

Operations director / ERP owner

Needs the ETO flow delivered as a clean, upgrade-safe Frappe app on the existing site — native DocTypes and permissions, no fork — with source owned in-house and support after go-live.

How Engineer-to-Order (ETO) Project Manufacturing Compares

CriterionECOSIRECustom BuildCompetitorERPNext Native
Project-to-BOM-to-budget linkSingle ETO Project record binds sales order, engineered BOM, and budgetPossible but you design and maintain the whole model yourselfUsually adds one piece (e.g. BOM tools), not the full chainSeparate DocTypes with no ETO-level link between them
Progressive BOM releasePhase-by-phase BOM/routing build-up as engineering releasesAchievable with significant in-house dev effortRarely handles progressively-defined BOMsBOM expected largely defined before production
Budget vs actual (material + labor)Live committed-cost rollup via doc eventsCustom reports you build and keep in syncGeneric cost reports, not project-baselinedProject costing exists but not ETO-baselined
Change-order impactVersions BOM and recomputes cost/schedule vs baselineMust design versioning and impact logic from scratchTypically no baseline-aware change ordersNo native engineering change-order flow
Milestone-gated procurement/productionMR/Work Orders released only on approved milestonesBuildable with custom workflow and hooksNot milestone-aware out of the boxManual release, no milestone gate
Fit to your ETO processScoped and built to your exact flow and rolesFully tailored but you carry all the effortFixed feature set, adapt your process to itGeneric manufacturing, not ETO-specific
Upgrade safetySeparate app via hooks — no core fork, v15/v16Depends on your team's disciplineVaries by vendor qualityCore stays clean but lacks the capability
Support and ownershipPost-go-live support window + source in your git repoYou own and support everythingVendor SLA, source often not handed overCommunity/self-support only

Frequently Asked Questions about Engineer-to-Order (ETO) Project Manufacturing

How long does delivery take?

This is build-to-order, not an instant download. After a scoping call we quote a fixed scope, then build against it — typical delivery is one working week from confirmed scope, ending with UAT on staging before we install on your production site. Larger or heavily integrated scopes are quoted with their own timeline.

Is this an existing Frappe Cloud Marketplace app I can download today?

No. ECOSIRE designs, builds, installs, and supports it for your specific ETO flow. You receive the source in your own git repository — there is no public one-click install, because the value is in fitting it to how your engineering and project teams actually work.

Which ERPNext versions are supported?

We target ERPNext / Frappe v15 and v16. We build it as a proper native app with its own module and migrations so it upgrades cleanly alongside ERPNext rather than as a fork of core.

How do you handle updates and support after go-live?

Every engagement includes a post-go-live support window for defect fixes and configuration adjustments. Because you own the git repository, you can maintain it yourself or contract ECOSIRE for version upgrades, new features, and ongoing support beyond the included window.

Will this modify or fork ERPNext core?

No core files are patched. We ship a separate Frappe app that adds its own DocTypes and hooks into ERPNext via `hooks.py` doc events, whitelisted methods, client scripts, and scheduler events — so ERPNext and this app both stay upgradeable.

Can it integrate with our CAD, PLM, or reporting tools?

Yes. The ETO project state, budgets, and change-order impact are exposed through whitelisted methods and the standard Frappe REST API, so external CAD/PLM systems or BI tools can read and, where scoped, write to it under proper permissions.

What do you need from us to scope this?

A short scoping call covering your order-to-delivery flow, how BOMs are released across phases, your milestone and change-order process, and your team roles. From that we produce a fixed scope and quotation before any build starts.

Request a quote

Engineer-to-Order (ETO) Project Manufacturing

A project-driven engineer-to-order manufacturing layer for ERPNext that links each sales order to its engineered BOMs, project budget, and milestone-based production in one flow. ECOSIRE builds, installs, and supports it for your v15/v16 site after a quotation.

  • `ETO Project` DocType linking `Sales Order`, `Project`, engineered `BOM` tree, and a phase/milestone plan as one record
  • Progressive multi-level BOM and routing definition — engineering fleshes out each level as drawings release, without blocking the sales order
  • Live project budget-versus-actual for material and labor, kept in sync by server-side `validate`/`on_submit` doc events in `hooks.py`
  • `Change Order` DocType that versions the affected BOM and re-computes cost and schedule impact against the frozen baseline