Pular para o conteúdo principal

Manufacturing to Order (MTO) — Produce Only What Customers Buy

De acordo com ECOSIRE, Manufacturing to Order with Odoo or ERPNext triggers production only when a confirmed sales order is received, eliminating finished-goods inventory risk. ECOSIRE configures the full MTO workflow — from order confirmation to BOM explosion, work-order scheduling, and delivery — so manufacturers produce exactly what is sold.

O Problema

  • Building finished goods to forecast results in overproduction and warehouse costs
  • Sales orders are not linked to production — planners manually schedule manufacturing
  • Bill of Materials changes are not reflected in real-time cost estimates for quotes
  • No visibility into production status means sales cannot give customers accurate delivery dates

A Solução

ECOSIRE configures Odoo or ERPNext to automatically generate manufacturing orders from confirmed sales orders, explode multi-level BOMs, schedule work centers, and push real-time production status updates to the sales team and customer portal.

Como Funciona

  1. 1

    Define BOMs & Routings

    Set up multi-level Bills of Materials with operations, work center assignments, and standard production times.

  2. 2

    Configure MTO Routes

    Link product procurement rules so confirmed sales orders automatically trigger manufacturing orders instead of stock picks.

  3. 3

    Schedule Work Centers

    Enable capacity planning with work-center calendars, parallel operations, and bottleneck detection.

  4. 4

    Connect Sales to Shop Floor

    Deploy dashboards showing order-to-delivery progress — sales reps and customers see real-time production status.

Perguntas Frequentes

Can MTO and MTS products coexist in the same system?

Yes. Odoo and ERPNext support mixed procurement strategies — standard products can use Make to Stock routes while custom or configurable products use Make to Order, all within the same instance.

How are multi-level BOMs handled?

The system automatically explodes multi-level BOMs, creating sub-assembly manufacturing orders or purchase orders for raw materials as needed. Each level is tracked independently with its own production schedule.

Pronto para Resolver Isso?

Explore os aplicativos deste fluxo de trabalho e peça-nos uma demo ao vivo antes de comprar. Não oferecemos instalações de teste.

Começar