- Início
- Apps
- Specialized Solutions
- PLM & Engineering Change Orders (ECO/ECR)
Pré-visualização ilustrativaA build-to-order ERPNext application that adds real Product Lifecycle Management:
versioned BOMs with full revision history, formal Engineering Change Request and Change Order workflows, side-by-side revision diffing, and effectivity-dated rollout to production.
ECOSIRE builds, installs, and supports it after a scoping call.
O que é PLM & Engineering Change Orders (ECO/ECR)?
A build-to-order ERPNext application that adds real Product Lifecycle Management: versioned BOMs with full revision history, formal Engineering Change Request and Change Order workflows, side-by-side revision diffing, and effectivity-dated rollout to production. ECOSIRE builds, installs, and supports it after a scoping call. Built to order by ECOSIRE for ERPNext v15, v16 — indicative price from $999.00 USD; request a quote for a scoped proposal.
Recursos Principais
Feito sob encomenda, pronto para você
Sem configuração por conta própria — um app funcional criado, instalado e com suporte da ECOSIRE.
- 1
Você faz o pedido
Comece com um preço único de desenvolvimento. Definimos o escopo com você no início.
- 2
Nós criamos e instalamos
A ECOSIRE cria, configura e instala no seu ERPNext.
- 3
No ar + suporte
Você entra no ar em cerca de uma semana útil, com duas semanas de suporte após a entrada em produção. Defeitos no código que entregamos são corrigidos gratuitamente.
Especificações Técnicas
- Compatibilidade com ERPNext
- —
- Licença
- A licença precisa de confirmação
- Requisito Python
- Python 3.10+
- Banco de Dados
- MariaDB 10.6+
Sobre este Produto
Discrete and engineer-to-order manufacturers live and die by how well they control design changes. In stock ERPNext, a BOM is versioned in a shallow way — you can amend a submitted BOM or create a new BOM against the same item, but there is no formal change-request stage, no approval gate before a change reaches production, no structured diff between two revisions, and no effectivity window that tells the shop floor exactly when the new design takes over. Engineers end up managing change control in spreadsheets and email threads, WIP is built against superseded drawings, and nobody can answer "which revision was released, by whom, and against which ECO?" during an audit. This is exactly where native ERPNext runs out of road for a serious engineering organization.
We build a proper Frappe app — its own module, not a pile of customizations bolted onto core doctypes — that layers a real PLM change-control process on top of ERPNext's existing Item and BOM. New DocTypes model the process end to end: an Engineering Change Request captures the proposed change, affected items, reason, and impact assessment; an Engineering Change Order groups approved changes, links the outgoing and incoming BOM revisions, carries effectivity dates, and drives the release. A revision-history DocType keeps an immutable record of every BOM version with the ECO that authorized it, so the full lineage is queryable. Approvals run on Frappe's native Workflow engine with role-profile-based transitions (Engineer, Reviewer, Approver, Release), so who-can-do-what is enforced by ERPNext permissions rather than convention.
The technical mechanics are grounded in Frappe primitives you can inspect and extend. hooks.py document events (on_submit, before_save, on_update_after_submit) enforce that a BOM only becomes active through a released ECO and that effectivity dates are respected. Server-side whitelisted methods produce the side-by-side revision diff — comparing components, quantities, operations, and routing between two BOM versions and rendering an add/change/remove report inside the ECO. Client scripts drive the in-form experience (revision picker, diff viewer, impact summary), while a scheduler event checks for ECOs whose effectivity date has arrived and flips the controlled rollout so the new revision becomes the default at the right moment — not the moment someone clicks submit. Everything is reachable over the Frappe REST API and the whitelisted methods, so your MES, PLM/CAD vault, or drawing system can push and pull change data programmatically. Drawings and specification documents attach per revision via Frappe's File attachments, so every BOM version carries its own controlled document set.
Because this is build-to-order, nothing is a generic download you self-install and hope fits. We start with a scoping call to map your change-control process, roles, and effectivity rules onto the app, then build against your actual ERPNext instance and BOM structure. Typical delivery is one working week from confirmed scope. You receive the full installable source for your version, a UAT pass on a staging bench with a rollback plan, and a support window after go-live. The app targets Frappe/ERPNext v15 and v16, and the git repository is handed over to you so you own what you paid for.
O que você ganha
- Installable source code for your commissioned version of the PLM & ECO app
- Installation and configuration on your ERPNext instance, including workflow, role profiles, and numbering series
- Technical documentation covering DocTypes, doc events, whitelisted methods, and scheduler behavior
- User guide plus a live training session for engineering and approver roles
- UAT on a staging bench with a documented rollback plan before production cutover
- Post-go-live support window for defect fixes and configuration adjustments
- Git repository handover so you own the source and its full history
Para quem é isso
Engineering / R&D Manager
Owns the change-control process at an ETO or discrete manufacturer with frequent design changes. Needs formal ECR-to-ECO approval gates, revision diffing, and a defensible record of who released what and when — not spreadsheets and email threads.
Manufacturing / Production Manager
Needs the shop floor to always build against the currently effective revision. Relies on effectivity dates and controlled rollout to know exactly when a design change takes over and to avoid WIP built against superseded drawings.
Quality / Compliance Lead
Responsible for audit readiness in regulated or contract-manufacturing environments. Needs full change lineage, immutable revision history, and role-enforced approvals traceable in the ERPNext document timeline.
ERP / IT Administrator
Owns the ERPNext platform and wants a clean Frappe app with its own module rather than forked core doctypes. Values REST API access for CAD/MES integration, v15/v16 support, and a git repo handover for maintainability.
Como PLM & Engineering Change Orders (ECO/ECR) se compara
| Critério | ECOSIRE | Construção personalizada | Concorrente | Nativo do ERPNext |
|---|---|---|---|---|
| Change-request workflow (ECR/ECO) | Formal ECR-to-ECO stages on native Frappe Workflow with role-based approvals | Possible but you design and build the whole state machine yourself | Often a fixed workflow you can't fully align to your process | No change-request concept; amend BOM or create a new one |
| BOM revision history | Immutable revision-history DocType tied to the authorizing ECO | Whatever your team has time to build and maintain | Basic version list, rarely linked to a change order | Amended-doc trail only; no engineering-change lineage |
| Revision diff / comparison | Server-side side-by-side diff of components, quantities, operations, routing | Must be written from scratch and kept in sync with BOM schema | Limited or absent; often a manual side-by-side | None — compare two BOMs by eye |
| Effectivity dates & controlled rollout | Scheduler-driven activation on the planned effectivity date | Requires custom scheduler jobs and guard logic | Rarely supports date-based effectivity | Not available; changes are effective on submit |
| Fit to your process | Built to your roles, numbering, and effectivity rules from a scoping call | Fully bespoke but you carry all design and QA risk | You adapt your process to the app's assumptions | Constrained to core BOM behavior |
| Integration (API) | REST API plus whitelisted methods for CAD/MES push and pull | Depends entirely on what you implement | Varies; often no dedicated change-control endpoints | Generic Frappe REST on core doctypes only |
| Delivery & timeline | Build-to-order, typically one working week from confirmed scope | Unpredictable; depends on in-house capacity | Instant install but generic fit | Already present, but only core capability |
| Ownership & support | Full source, git handover, and a post-go-live support window | You own it and you maintain it entirely | Vendor-locked; updates on their schedule | Covered by your ERPNext maintenance only |
Perguntas frequentes sobre PLM & Engineering Change Orders
How long does delivery take?
This is a build-to-order app, not an instant download. Typical delivery is one working week from confirmed scope. We begin with a scoping call to map your change-control process, roles, and effectivity rules, then build against your actual ERPNext instance. The exact timeline is fixed once scope is agreed.
How is this different from ERPNext's built-in BOM versioning?
Native ERPNext lets you amend a submitted BOM or create a new BOM against the same item, but it has no formal change-request stage, no approval gate before a change reaches production, no structured diff between revisions, and no effectivity window. This app adds ECR/ECO workflows, an immutable revision history, side-by-side diffing, and scheduler-driven effectivity rollout on top of the BOMs you already have.
Which versions of ERPNext do you support?
We build for Frappe/ERPNext v15 and v16. The app is delivered as a proper Frappe app with its own module and does not fork core doctypes, so it migrates cleanly with `bench migrate`. Tell us your current version at the scoping call and we target it precisely.
What kind of support and updates do I get after go-live?
Every engagement includes a post-go-live support window for defect fixes and configuration adjustments. Because you receive the full git repository, your own team can extend the app too. Longer-term maintenance, version upgrades (for example v15 to v16), and enhancements can be arranged as an ongoing support agreement.
Can it integrate with our CAD vault or MES?
Yes. All ECR/ECO and revision data is reachable over the Frappe REST API and dedicated whitelisted methods, so external systems can push change requests and pull released revisions programmatically. We scope the specific integration touchpoints during the scoping call.
Do we own the code, or is it locked to you?
You own it. We hand over the installable source and the git repository with its full history. There is no per-seat lock-in and no dependency on us to keep the app running — the support window exists to help, not to hold the code hostage.
How do effectivity dates control the rollout to production?
An ECO carries effectivity dates linking the outgoing and incoming BOM revisions. A Frappe scheduler event checks daily for ECOs whose effectivity date has arrived and activates the new revision as the default at that point — so the shop floor switches to the new design on the planned date, not the moment someone clicks submit.
Módulos Relacionados

Pest Control Service Management for ERPNext
A build-to-order ERPNext application that runs the pest control service cycle end to end: recurring treatment schedules and technician routes, regulated chemical usage logs, signed service reports and certificates, and automatic contract renewal.

Petrol Pump & Fuel Station Management
A build-to-order ERPNext application that turns nozzle meter readings, shift closings, and tank dips into reconciled fuel stock and cash. ECOSIRE scopes, builds, installs, and supports it for your petrol or fuel-retail operation.

PPAP / APQP Automotive Quality Pack
An IATF 16949-aligned PPAP and APQP document-control system built as a native Frappe app on ERPNext, giving automotive and aerospace tier suppliers phase-gate tracking, element checklists and one-click PSW generation. Build-to-order: ECOSIRE scopes, builds, installs and supports it for you.

Preventive Maintenance & CMMS for ERPNext
A full computerized maintenance management system built natively inside ERPNext — asset registry, time- and usage-based preventive schedules, corrective work orders, spare-parts consumption, and MTBF/MTTR analytics. ECOSIRE scopes, builds, installs, and supports it for you.
PLM & Engineering Change Orders
A build-to-order ERPNext application that adds real Product Lifecycle Management: versioned BOMs with full revision history, formal Engineering Change Request and Change Order workflows, side-by-side revision diffing, and effectivity-dated rollout to production. ECOSIRE builds, installs, and supports it after a scoping call.
- Dedicated Frappe app and module with `Engineering Change Request` and `Engineering Change Order` DocTypes linked to core `Item` and `BOM`
- BOM version control with an immutable revision-history DocType recording every version and the ECO that authorized it
- Native Frappe Workflow for ECR/ECO with role-profile transitions (Engineer, Reviewer, Approver, Release) enforced by ERPNext permissions
- Server-side whitelisted method that computes a side-by-side BOM revision diff — components, quantities, operations, and routing changes as add/change/remove