A visual load board for Dynamics 365 Business Central manufacturing that shows what is scheduled at each work center, flags overload and underload, and lets supervisors drag production orders to rebalance capacity. Built, installed, and supported by ECOSIRE as a per-tenant AL extension. One-time license from $499.00 USD for Dynamics 365 BC (build-to-order) — includes 12 months of updates and support.

A visual load board for Dynamics 365 Business Central manufacturing that shows what is scheduled at each work center, flags overload and underload, and lets supervisors drag production orders to rebalance capacity. Built, installed, and supported by ECOSIRE as a per-tenant AL extension.
现在无需付款。此操作会向我们的团队发送报价请求——我们会通过邮件跟进价格和后续步骤。
Business Central tracks work-center and machine-center capacity in the background, but the standard product gives supervisors no single screen that answers the daily question: what is loaded where, and where am I over capacity? Planners are left reading the Capacity Ledger, running the Work Center Load matrix, and exporting to Excel to see the picture.
Per-work-center load board showing scheduled load versus available capacity for a chosen day, week, or planning horizon, read live from the Capacity Ledger and production-order routing lines.
Color-coded overload and underload flags so a supervisor can see at a glance which workstations are above 100% and which have idle headroom.
Drag-to-rebalance: move a routing operation from an overloaded work center to one with capacity, writing the change back to the Prod. Order Routing Line and recalculating load instantly.
Capacity-leveling suggestions that propose where to shift work to flatten peaks while respecting operation sequence and routing constraints.
Shift- and calendar-aware loading that reflects shop calendars, shift definitions, Calendar Absence Entries, and planned downtime so available capacity is realistic.
Built as an AL per-tenant extension using table and page extensions plus event subscribers — no modification of base Business Central objects.
The Graphical Work-Center Load Manager closes that gap. It is a per-tenant AL extension that renders a visual load board over your existing routing, capacity, and production-order data. Each work center shows its scheduled load against available capacity for the chosen horizon, with clear color flags for overload and underload. Supervisors drag a routing operation from an overloaded work center to one with headroom, and the extension updates the underlying Prod. Order Routing Line and recalculates the load in place — no Excel round-trip.
Because it reads the same Calendar Absence Entry, shop calendar, and shift definitions Business Central already uses, the board is shift- and calendar-aware: a day with a planned maintenance window or a holiday shows reduced available capacity automatically. A capacity-leveling routine suggests where to move work to flatten peaks without breaking operation sequence.
This is build-to-order, not an instant AppSource download. ECOSIRE builds the extension in AL, tunes the load logic and visual thresholds to your routings and shift model, installs it as a per-tenant extension on your Business Central environment (cloud or on-prem), wires a dedicated permission set, and supports it after go-live. You get a board your supervisors actually open every morning, sitting on your real data — no separate system, no manual sync.
Levels daily and weekly load across workstations. Opens the board each morning to see which work centers are overloaded and drags operations to balance the line without waiting on a planner.
Owns the master schedule and routing sequence. Uses the leveling suggestions and drill-through to flatten capacity peaks while keeping operation order intact, instead of rebuilding the picture in Excel.
Needs a reliable read on capacity utilization across the shop. Uses the OData feed into Power BI to monitor over/underutilization trends and justify shift or equipment changes.
在 ecosire.com 上购买许可证并从您的帐户仪表板下载 Graphical Work-Center Load Manager 模块 ZIP。
将 ZIP 解压到服务器上的 Odoo 自定义插件文件夹中(或通过“应用程序”>“从 Odoo.sh / runbot 上的文件安装”上传)。
激活开发者模式,打开应用程序,单击更新应用程序列表,搜索 Graphical Work-Center Load Manager,然后按安装。
打开新菜单,粘贴您的 ECOSIRE 许可证密钥,连接任何外部凭据(Shopify、Amazon、Stripe 等),然后保存。
运行内置连接测试,同步前 10 条记录,并安排定期 cron。如果出现任何问题,请联系支持人员。
| 标准 | 伊科西尔 | 定制建造 | 竞争对手 | 奥杜本机 |
|---|---|---|---|---|
| Visual per-work-center load board inside Business Central | ||||
| At-a-glance overload / underload color flags | ||||
| Drag-to-rebalance writing back to production-order routing lines | ||||
| Shift- and calendar-aware available capacity | ||||
| Tuned to your specific routings, shifts, and thresholds | ||||
| Per-tenant AL extension, upgrade-safe (no base-object changes) | ||||
| OData/REST feed to Power BI / Power Platform | ||||
| Installed and supported on your environment after purchase |
Typical delivery is two to four weeks from when we have access to your Business Central environment (sandbox first) and a session to review your routings, shift model, and work-center groups. Simpler shops with standard routings are at the faster end; complex multi-line or multi-shift setups with custom capacity logic take longer. We confirm a firm lead time in writing after the scoping call, build in your sandbox, validate the load figures against your live data, then install to production.
No. This is build-to-order. ECOSIRE builds the extension in AL specifically for your routings and shift model and installs it as a per-tenant extension on your Business Central environment. There is no public AppSource listing or instant download — that lets us tune the load logic, thresholds, and permission set to your shop rather than ship a generic one-size board.
We include a support period after go-live for fixes and tuning, and offer an ongoing support arrangement after that. Because it is a per-tenant extension built only with table extensions, page extensions, and event subscribers — never base-object modifications — it survives Microsoft's monthly and major Business Central updates cleanly. If a future Business Central release changes a capacity or routing object we depend on, we update the extension as part of support so it keeps working.
The board reads your existing Capacity Ledger, production orders, and shop calendars without altering them. The only write operation is the explicit drag-to-rebalance action, which updates the Prod. Order Routing Line exactly as a planner would by hand — through standard Business Central logic, gated by the supervisor permission set, and validated before commit. Read-only viewing never changes anything.
Yes. We can expose per-work-center load through an OData/REST endpoint so it can be pulled into Power BI or a Dataverse / Power Platform dashboard. This is optional; if you only need the board inside Business Central we skip it. When included, we provide a sample connection so your BI team can build trend and utilization reports on top of the same figures supervisors see.
Yes. The extension is standard AL and installs as a per-tenant extension on either Business Central online (SaaS) or an on-premises / private-cloud deployment. The OData endpoint and Power Platform integration are most straightforward on SaaS; on-prem deployments are fully supported with the equivalent web-service configuration.
A visual load board for Dynamics 365 Business Central manufacturing that shows what is scheduled at each work center, flags overload and underload, and lets supervisors drag production orders to rebalance capacity. Built, installed, and supported by ECOSIRE as a per-tenant AL extension.