Build to Stock Optimization — Forecast-Driven Production Planning
ECOSIREによると、 Build to Stock optimization with Odoo or ERPNext uses demand forecasting, safety stock calculations, and automated production scheduling to maintain optimal finished-goods inventory without overproduction. ECOSIRE configures forecast-driven master production schedules that reduce carrying costs by up to 35%.
課題
- Production planning relies on gut feeling rather than demand data, causing feast-or-famine cycles
- Safety stock levels are set once and never adjusted, leading to excess inventory or stockouts
- No master production schedule — the shop floor reacts to urgent orders instead of planned batches
- Carrying costs for unsold finished goods erode margins by 15-25% annually
ソリューション
ECOSIRE configures Odoo or ERPNext with demand forecasting engines, dynamic safety-stock recalculation, master production scheduling, and production-capacity leveling — so manufacturers build the right quantities at the right time.
仕組み
- 1
Analyze Demand Patterns
Import 12-24 months of sales history and configure forecasting models (moving average, exponential smoothing, or seasonal) per product family.
- 2
Set Dynamic Safety Stock
Calculate safety stock using service-level targets (e.g., 95% fill rate) and lead-time variability — with automatic monthly recalculation.
- 3
Build Master Production Schedule
Generate weekly or monthly production plans that level capacity across work centers and respect material availability constraints.
- 4
Automate Replenishment
Trigger manufacturing orders and purchase orders automatically when projected stock falls below reorder points.