- ホーム
- Apps
- Specialized Solutions
- Supplier Quality & Vendor Scorecard
イメージプレビューA build-to-order ERPNext app that adds incoming-quality inspection,
defect PPM and reject-rate tracking, SCAR corrective-action workflows, and weighted vendor scorecards.
ECOSIRE builds, installs, and supports it — request a quotation to start.
Supplier Quality & Vendor Scorecardとは?
A build-to-order ERPNext app that adds incoming-quality inspection, defect PPM and reject-rate tracking, SCAR corrective-action workflows, and weighted vendor scorecards. ECOSIRE builds, installs, and supports it — request a quotation to start. Built to order by ECOSIRE for ERPNext v15, v16 — indicative price from $999.00 USD; request a quote for a scoped proposal.
主な機能
受注生産、すべておまかせ
自分での設定は不要 — ECOSIRE が構築・インストール・サポートする実働アプリです。
- 1
ご注文
一回限りの構築料金から始めます。キックオフで一緒に範囲を決めます。
- 2
構築とインストール
ECOSIRE がお客様の ERPNext 上で構築・設定・インストールします。
- 3
本番稼働 + サポート
約1週間(営業日ベース)で稼働し、本番稼働後2週間のサポートが付きます。納品したコードの不具合は無償で修正します。
技術仕様
- ERPNext互換性
- —
- ライセンス
- ライセンスの確認が必要です
- Python要件
- Python 3.10+
- データベース
- MariaDB 10.6+
この製品について
ERPNext gives you Purchase Orders, Purchase Receipts, and a basic Quality Inspection DocType, but supplier quality engineers quickly run out of road. There is no rolled-up defect PPM per vendor, no formal SCAR (Supplier Corrective Action Request) lifecycle with 8D-style containment and root-cause fields, and no weighted scorecard that blends quality, on-time delivery, and cost into a single grade you can defend in a supplier review. Teams end up exporting Purchase Receipt and Quality Inspection data into spreadsheets every month, which breaks the moment your Approved Vendor List and qualification status need to gate actual procurement decisions.
ECOSIRE builds a proper Frappe app (supplier_quality) installed onto your bench, not a pile of custom fields. It ships new DocTypes — Incoming Inspection, Supplier Corrective Action Request, Vendor Scorecard Period, and Approved Vendor — linked to standard Supplier, Item, and Purchase Receipt records so nothing is duplicated. Inspection results captured against a receipt line write reject quantities and defect codes back through hooks.py doc events (on_submit, validate), and scheduled events (scheduler_events in hooks.py) aggregate rejects into defect PPM and reject-rate figures per supplier and per item on a nightly or period cadence. A failed inspection can auto-raise a SCAR and route it through a Frappe workflow (Open → Containment → Root Cause → Corrective Action → Verification → Closed) with due-date reminders and assignment.
Weighted scorecards are computed server-side: you configure the weights (e.g. quality 50%, delivery 30%, cost 20%) and the app rolls each supplier's period metrics into a graded score, surfaced on dashboards and a print-format scorecard PDF you can send to the vendor. Whitelisted methods exposed over the Frappe REST API let your other systems pull a supplier's current grade or push inspection data, and client scripts add in-form buttons (raise SCAR, view trend) on the Supplier and Purchase Receipt forms. Access is governed by permissions and a dedicated "Supplier Quality Engineer" role profile so procurement, quality, and management each see the right slice.
Because this is build-to-order, nothing ships until we agree on scope. We start with a short scoping call, confirm your defect taxonomy, scorecard weights, SCAR stages, and AVL rules, then build against Frappe/ERPNext v15 (and v16 where you are already migrated). Typical delivery is one working week from confirmed scope. You get the installable app source, a UAT pass on your staging bench with a rollback plan, a documented handover, and a post-go-live support window — not a black box.
得られるもの
- Installable Frappe app source code (`supplier_quality`) built for your ERPNext v15/v16 bench
- Installation and configuration on your environment, including DocTypes, workflow, role profile, and scheduler events
- Technical documentation: DocType schema, hooks, whitelisted API methods, and scorecard weighting logic
- End-user guide plus a live training session for quality and procurement staff
- UAT on a staging bench with a signed-off test plan and a documented rollback procedure
- Post-go-live support window for defect fixes and configuration adjustments
- Git repository handover with full commit history and README
- Sample data / seed configuration (defect codes, scorecard weights, workflow states) to jump-start go-live
これは誰のためのものですか
Supplier Quality Engineer
Owns incoming inspection and vendor performance. Needs defect PPM per supplier, a real SCAR workflow with root-cause and verification stages, and a defensible weighted scorecard — not monthly spreadsheet exports out of ERPNext.
Procurement / Sourcing Lead
Decides which suppliers get the next PO. Needs the Approved Vendor List and qualification status wired into ERPNext so a disqualified or probationary vendor is visible at the point of purchasing.
Quality Manager
Reports supplier quality to leadership and drives supplier reviews. Needs trend dashboards, open-SCAR aging, and a print-ready scorecard PDF to run quarterly business reviews.
ERP / IT Administrator
Maintains the Frappe bench. Wants a clean installable app with proper DocTypes, hooks, permissions, and REST endpoints — plus source-code handover — rather than untracked customizations that break on upgrade.
Supplier Quality & Vendor Scorecard の比較方法
| 基準 | エコシエール | カスタムビルド | 競合他社 | ERPNext 標準機能 |
|---|---|---|---|---|
| Defect PPM per supplier | Computed server-side, stored per supplier and item each period | Possible but you build and maintain the rollup logic | Often a static field, rarely a true PPM rollup | Not available — Quality Inspection is per-check only |
| SCAR corrective-action workflow | Full 8D-style Frappe workflow with verification and reminders | Buildable from scratch at your time and cost | Basic status field, usually no verification stage | None — no supplier corrective-action concept |
| Weighted vendor scorecard | Configurable quality/delivery/cost weights, graded, PDF-ready | You design the weighting and grading engine | Fixed weighting, limited configurability | Not available out of the box |
| Approved Vendor List / qualification | AVL with statuses that can gate procurement | Custom DocType you scope and build | Sometimes a simple flag, rarely gating | No structured AVL or qualification state |
| Delivery time | one working week from confirmed scope, built to your bench | Weeks to months depending on your backlog | Instant download, then fit-gap and rework | Immediate but missing the capability entirely |
| Fit to your process | Scoped to your defect codes, weights, and SCAR stages | Fully bespoke — highest effort | Generic; you adapt to its assumptions | You bend spreadsheets around ERPNext gaps |
| REST API & integration | Whitelisted methods for grades and inspection intake | You define and secure the endpoints | Varies; often no documented API | Standard REST but no quality endpoints |
| Source & support | Full git handover + post-go-live support window | You own code but carry all maintenance | Vendor-locked, support tier dependent | Community support only, no app to own |
Supplier Quality & Vendor Scorecard に関するよくある質問
How long does delivery take?
This is a build-to-order app, not an instant download. Typical delivery is one working week from confirmed scope. After the scoping call we lock the defect taxonomy, scorecard weights, SCAR stages, and AVL rules, then build, UAT on your staging bench, and deploy.
Which ERPNext versions are supported?
We build against Frappe/ERPNext v15, and v16 where you have already migrated. We target your exact bench version so the DocTypes, workflow, and hooks install cleanly and survive standard app upgrades.
How do updates and support work after go-live?
Every engagement includes a post-go-live support window for defect fixes and configuration tweaks. You also receive the full git repository, so your own team or a future ECOSIRE engagement can extend it. We can quote an ongoing support/maintenance retainer separately.
Does it replace ERPNext's built-in Quality Inspection?
No — it complements it. ERPNext Quality Inspection handles a single check; our app adds the supplier-level rollups ERPNext lacks: defect PPM per vendor, the SCAR lifecycle, weighted scorecards, and the Approved Vendor List. We link to standard Supplier, Item, and Purchase Receipt records rather than duplicating them.
Can other systems read the scorecards or push inspection data?
Yes. We expose whitelisted methods over the Frappe REST API so external MES/PLM or portals can fetch a supplier's current grade or submit inspection results. Access is governed by ERPNext permissions and API keys.
Will it interfere with our upgrades or existing customizations?
It ships as a self-contained Frappe app with its own DocTypes and hooks, kept separate from ERPNext core. We test on a staging bench first and hand over a rollback plan, so a bench update or migration has a known-good fallback.
Can we configure our own scorecard weights and defect codes?
Yes. Scorecard weights (quality/delivery/cost), the defect taxonomy, SCAR workflow stages, and AVL qualification statuses are all configurable. We seed sensible defaults during the build and hand you the settings to adjust them later.
関連モジュール

Statistical Process Control (SPC) & Control Charts
A build-to-order Frappe app that turns ERPNext Quality Inspection data into real-time SPC — X-bar/R, X-MR, p/np/c/u control charts, Cp/Cpk/Pp/Ppk capability indices, and rule-based out-of-control alerts. ECOSIRE scopes, builds, installs, and supports it for your v15/v16 site.

Tooling, Mold & Fixture Lifecycle Management
A build-to-order ERPNext application that turns your molds, dies, jigs and fixtures into tracked assets with shot-count and cycle-count usage, life-limit alerts, and maintenance work orders. ECOSIRE scopes, builds, installs and supports it for your Frappe/ERPNext v15/v16 site.
Supplier Quality & Vendor Scorecard
A build-to-order ERPNext app that adds incoming-quality inspection, defect PPM and reject-rate tracking, SCAR corrective-action workflows, and weighted vendor scorecards. ECOSIRE builds, installs, and supports it — request a quotation to start.
- `Incoming Inspection` DocType linked to `Purchase Receipt` and `Purchase Order` lines, capturing sampled qty, reject qty, and defect codes per item
- Configurable defect taxonomy (defect category / defect code child tables) so PPM rolls up by defect type as well as by supplier
- Defect PPM and reject-rate computed server-side and stored per supplier and per item for each scorecard period
- SCAR (Supplier Corrective Action Request) DocType with a Frappe workflow: Open → Containment → Root Cause → Corrective Action → Verification → Closed

