Drag-and-drop shift planning and rostering inside Business Central, tied to your HR employee data, availability, leave and attendance — built, installed as a per-tenant AL extension, and supported by ECOSIRE. Built to order by ECOSIRE for Dynamics 365 BC (build-to-order) — indicative price from $249.00 USD; request a quote for a scoped proposal.
示意预览Drag-and-drop shift planning and rostering inside Business Central,
tied to your HR employee data, availability, leave and attendance — built, installed as a per-tenant AL extension, and supported by ECOSIRE.
无需自行搭建——由 ECOSIRE 构建、安装并提供支持的可用应用。
以一次性构建价格开始。我们在启动时与您共同确定范围。
ECOSIRE 在您的 Dynamics 365 Business Central 上构建、配置并安装。
约 2–4 周内上线,并提供上线后的支持期。
Most Business Central teams plan shifts in spreadsheets that drift out of sync with the actual HR data sitting in BC. Workforce Scheduling & Shift Roster closes that gap by bringing the roster inside Dynamics 365 Business Central as a native AL extension, reading directly from the Employee, Resource, and absence tables you already maintain.
This is a build-to-order product. ECOSIRE builds the extension to fit your shift patterns, installs it as a per-tenant extension on your Business Central environment (cloud SaaS or on-prem), and supports it after go-live. It is not an instant Microsoft AppSource download — you get a scoped build, a real installation on your tenant, and a named engineer behind it.
The core is a drag-and-drop shift builder rendered through a custom AL page, backed by new ledger-style tables for shifts, templates, and assignments. Event subscribers keep the roster honest: when an employee files leave or an availability record changes, the affected shifts flag immediately. Open shifts can be published for bidding, and swaps route through an approval flow. A coverage and labor-cost view forecasts hours and wage cost per location against demand, using employee pay-rate data.
Scheduling data is exposed through custom API (v2) / OData pages so rosters flow to Power BI, the Power Platform, or a mobile flow that pushes shift notifications. Background recalculation runs on the Job Queue. Dedicated permission sets keep planners, managers, and staff scoped correctly. Everything is your data, in your tenant — no third-party scheduling silo, no re-keying, no export-import dance between BC and a separate roster tool.
Runs rotating shifts across multiple store locations and needs coverage planned against footfall and labor budget without leaving Business Central or re-keying staff data.
Builds weekly rotas for variable-demand venues, handles last-minute swaps and open shifts, and needs staff notified on their phones the moment a roster publishes.
Schedules clinical staff around certifications, leave and minimum-rest rules, where a double-booking or an unfilled shift is a compliance and safety risk, not just an inconvenience.
| 标准 | 伊科西尔 | 定制建造 | 竞争对手 | Dynamics 365 Business Central 原生 |
|---|---|---|---|---|
| Drag-and-drop shift roster inside Business Central UI | 包含 | 部分支持 | 部分支持 | 不包括在内 |
| Reads BC employee, availability and leave data natively (no re-keying) | 包含 | 包含 | 部分支持 | 不包括在内 |
| Open-shift bidding and approved swap workflow | 包含 | 部分支持 | 包含 | 不包括在内 |
| Coverage and labor-cost forecasting against BC pay rates | 包含 | 部分支持 | 部分支持 | 不包括在内 |
| Built, installed per-tenant and supported for you (no AppSource self-serve) | 包含 | 部分支持 | 不包括在内 | 不包括在内 |
| Tailored to your exact shift patterns and labor rules | 包含 | 包含 | 不包括在内 | 不包括在内 |
| AL source code handed over to you | 包含 | 包含 | 不包括在内 | 不包括在内 |
| Power BI / Power Platform / mobile notification integration via API pages | 包含 | 部分支持 | 部分支持 | 不包括在内 |
Typical lead time is 2 to 4 weeks from a confirmed scope. We start with a short requirements pass on your shift patterns, leave rules and pay structure, build the AL extension, install and validate it on your sandbox, then deploy to production with you. Heavier customization (complex labor-law rules, deep Dataverse/Power Apps portals) can extend that — we give you a firm date once scope is locked, not a vague promise.
No. This is a build-to-order, per-tenant extension. ECOSIRE develops it specifically for your tenant and shift model and installs it directly on your Business Central environment. There is no instant AppSource download. The upside is that it fits your processes exactly and you receive the AL source code; the trade-off is the short build lead time above.
Your purchase includes a defined post-go-live support window for fixes and questions. Because it is a per-tenant extension, it follows your environment's update cadence; we test it against Business Central's major-release schedule and adjust event subscribers or APIs if Microsoft deprecates something. Ongoing maintenance, enhancements and future-version compatibility are available as a separate support retainer.
Yes. The extension is written in AL against the supported extension model, so it deploys to Business Central online (cloud SaaS) as a per-tenant extension and to supported on-premises versions. We confirm your exact version and localization during scoping, since available HR/absence tables and API surfaces vary slightly by version and country.
Yes. The extension exposes rosters, assignments and coverage through custom API (v2) / OData pages. From there we can wire a Power BI report, a Power Apps canvas app for staff self-service, and a Power Automate flow that pushes shift notifications to employees by email, Teams or mobile push. These integrations are scoped with you so you only pay for the channels you need.
Drag-and-drop shift planning and rostering inside Business Central, tied to your HR employee data, availability, leave and attendance — built, installed as a per-tenant AL extension, and supported by ECOSIRE.