Project and job timesheets in Business Central with weekly entry grids, multi-level approvals and cost/billing rates that post straight into job costing and payroll. Built as a per-tenant AL extension, installed and supported by ECOSIRE on your own environment. Built to order by ECOSIRE for Dynamics 365 BC (build-to-order) — indicative price from $249.00 USD; request a quote for a scoped proposal.
Project and job timesheets in Business Central with weekly entry grids,
multi-level approvals and cost/billing rates that post straight into job costing and payroll. Built as a per-tenant AL extension, installed and supported by
ECOSIRE on your own environment.
无需自行搭建——由 ECOSIRE 构建、安装并提供支持的可用应用。
以一次性构建价格开始。我们在启动时与您共同确定范围。
ECOSIRE 在您的 Dynamics 365 Business Central 上构建、配置并安装。
约 2–4 周内上线,并提供上线后的支持期。
Microsoft Dynamics 365 Business Central ships with a basic Resource time-sheet, but project-driven firms quickly outgrow it: no billable/non-billable split on the grid, weak approval routing, and no clean path from logged hours to job cost and payroll. Timesheet & Time Tracking for Business Central closes that gap.
This is a build-to-order AL extension, not an instant AppSource download. ECOSIRE designs, builds, installs and supports it as a per-tenant extension deployed directly to your Business Central environment (cloud/SaaS or on-prem). You get source-aligned AL that fits your chart of accounts, dimensions and posting rules — not a generic app you have to bend your process around.
What it does. Page extensions add weekly and daily timesheet grids with inline Project, Job, Job Task and activity-code allocation. A table extension stores billable flags, cost rates and billing rates per line. A configurable multi-level approval workflow (built on Business Central's native Workflow + Approval engine, surfaced through the Job Queue and notifications) routes submissions from employee → line manager → project manager. On approval, event subscribers post hours as Job Journal Lines (cost-rate to GL and job, billing-rate to WIP/invoice), so project costing and customer billing stay reconciled.
Integration-ready. Standard tables are exposed via the Business Central REST/OData v4 API for Power BI, mobile capture and Dataverse / Power Platform flows. Dedicated permission sets keep entry, approval and posting segregated. Everything is delivered with deployment notes and a short handover so your team — or ours — can run it day to day.
Honest delivery: typical build and install runs 2–4 weeks from requirements sign-off, depending on approval depth and posting customization. ECOSIRE provides the AL source, the app file, installation on your tenant, and ongoing support.
Runs project delivery on Business Central and needs accurate weekly time captured against jobs and tasks, with billable hours flowing cleanly into client invoicing and utilization reporting.
Wants approved hours to post automatically as job and GL cost at the right rate, so WIP, project margin and customer billing reconcile without manual re-keying.
Responsible for the tenant and needs a clean per-tenant AL extension with proper permission sets, approval workflow and OData APIs — not a fragile manual customization or an over-scoped generic app.
| 标准 | 伊科西尔 | 定制建造 | 竞争对手 | Dynamics 365 Business Central 原生 |
|---|---|---|---|---|
| Weekly timesheet grid with billable/non-billable per line | 包含 | 部分支持 | 部分支持 | 不包括在内 |
| Multi-level approval workflow (line manager → project manager) | 包含 | 部分支持 | 部分支持 | 部分支持 |
| Cost-rate and billing-rate posting to GL and Job Journal | 包含 | 部分支持 | 部分支持 | 部分支持 |
| Built to your jobs, dimensions and posting rules | 包含 | 包含 | 不包括在内 | 不包括在内 |
| Installed as a per-tenant AL extension with source handed over | 包含 | 包含 | 不包括在内 | 不包括在内 |
| REST/OData API + Power Platform / Dataverse integration path | 包含 | 部分支持 | 部分支持 | 部分支持 |
| Dedicated permission sets segregating entry/approval/posting | 包含 | 部分支持 | 部分支持 | 部分支持 |
| Ongoing support + recompile for BC major releases | 包含 | 不包括在内 | 部分支持 | 包含 |
Typical delivery is 2–4 weeks from the point your requirements are signed off — approval depth, rate logic and posting customization drive the exact timeline. ECOSIRE builds the AL extension, reviews the approval and posting design with you, installs it as a per-tenant extension on your environment, and runs a full submit-approve-post smoke test before handover. This is a build-to-order engagement, not an instant AppSource download.
It is not an AppSource listing you self-download. It is a per-tenant AL extension that ECOSIRE compiles and installs directly onto your Business Central tenant (SaaS or on-prem). You receive the .app file and the full AL source, so you are never locked to us — though most clients keep us on for support and changes.
Yes. Because it is built to order, allocation is validated against your actual Job, Job Task and activity codes, and posting respects your GL accounts, dimensions and shortcut dimensions. We configure the cost-rate and billing-rate mapping to match how you already run job costing in Business Central.
Yes. The timesheet tables are exposed through Business Central's REST/OData v4 API, so you can build Power BI dashboards on top of them and capture entries via a Power Apps mobile screen or Dataverse sync. We include endpoint documentation and a sample connection guide; deeper Power Platform apps can be added as a follow-on scope.
ECOSIRE supports the extension on your environment after delivery: bug fixes, permission and workflow adjustments, and recompiles to stay compatible with Microsoft's Business Central major releases (the cloud cadence is roughly twice a year). Support and enhancement terms are agreed per engagement; because you hold the AL source, you also retain the option to maintain it with your own AL developers.
Project and job timesheets in Business Central with weekly entry grids, multi-level approvals and cost/billing rates that post straight into job costing and payroll. Built as a per-tenant AL extension, installed and supported by ECOSIRE on your own environment.