انتقل إلى المحتوى الرئيسي
Zoho OneSpecialized Solutions

Production Planning and Capacity Scheduler

A build-to-order planning layer for Zoho:

material requirement planning, finite capacity scheduling and shop-floor sequencing over your work orders. Scoped, built and installed by ECOSIRE.

تطوير حسب الطلب

ما هو Production Planning and Capacity Scheduler؟

A build-to-order planning layer for Zoho: material requirement planning, finite capacity scheduling and shop-floor sequencing over your work orders. Scoped, built and installed by ECOSIRE. Built to order by ECOSIRE for Zoho One (build-to-order) — indicative price from $999.00 USD; request a quote for a scoped proposal.

Production Planning and Capacity Scheduler — A build-to-order planning layer for Zoho: material requirement planning, finite capacity scheduling and shop-floor sequencing over your work orders

What we build

  • Time-phased MRP engine in Deluge netting demand from Zoho Inventory Sales Orders, work orders, forecast and safety stock against on-hand stock, open Purchase Orders and scheduled receipts
  • Multi-level BOM explosion so finished-goods demand becomes dated requirements for every sub-assembly and raw material
  • Planned purchase order suggestions respecting supplier lead time, minimum order quantity and order multiple, convertible into Zoho Inventory Purchase Orders via REST API
  • Planned work order suggestions with start dates derived by backward scheduling from the required-by date
  • Work centre calendars covering shift patterns, working days, holidays and planned maintenance downtime
  • Capacity load profile per work centre and period showing committed load, available capacity and overload, in both infinite and finite scheduling modes
  • Configurable sequencing rules including earliest due date, order priority, shortest setup and setup-family grouping to reduce changeovers
  • Shop-floor dispatch list per work centre delivered as a Zoho Creator screen and Sigma widget, with start, pause and completion capture
  • Manual drag-and-rank override of the sequence with automatic re-derivation of downstream dates
  • Capable-to-promise custom function callable from a Zoho CRM Deal or Zoho Inventory Sales Order returning the earliest achievable date and writing it back to the record
  • Scheduled exception engine raising late orders, projected negative stock dates, over-capacity periods and expedite candidates as Zoho CRM tasks, email or Zoho Cliq messages through Zoho Flow
  • Planning-run history and audit so each plan version, its inputs and the orders released from it can be reviewed after the fact

عن هذا المنتج

The problem

Once you have work orders, the next question is the hard one: can you actually make what you have promised, with the material and the machine hours you have, by the dates on the sales orders? No Zoho application answers that. Zoho Inventory tells you what you hold today. It does not net demand against supply across a horizon, it does not tell you what to buy and when, and it has no concept of a work centre being full on Thursday.

So planning happens in a spreadsheet that is out of date by lunchtime. Purchase orders are raised late because nobody netted future demand against open POs. Two jobs are scheduled onto the same machine on the same day. A customer is promised a date that was never checked against capacity, and the first anyone knows is when the job does not ship.

This is a build-to-order engagement. Nothing is downloadable today. ECOSIRE scopes your planning model, quotes a fixed price, and builds it into your own Zoho org over a typical one working week lead time.

What ECOSIRE builds

Material requirement planning

We build an MRP engine in Zoho Creator and Deluge that runs across a planning horizon you define. It collects demand — open Zoho Inventory Sales Orders, released and planned work orders, forecast records and safety stock targets — and supply — on-hand stock by warehouse, open Purchase Orders with expected dates, and work orders due to complete. It explodes demand through the bill of material so a shortage of a finished good becomes a dated requirement for every component and sub-assembly beneath it.

The output is a time-phased netting picture per item and warehouse, and a set of planned orders: suggested purchase orders with quantity and required-by date, respecting supplier lead time, minimum order quantity and order multiple; and suggested work orders with a start date derived by backward scheduling from the need date. Planners review the suggestions in a Creator screen and convert approved ones straight into Zoho Inventory Purchase Orders or into work orders via the REST API, rather than retyping them.

Machine and labour capacity

Work centres carry a calendar — working days, shift patterns, holidays, planned maintenance — and an available capacity per period. Every scheduled operation consumes capacity from its work centre. The result is a load profile per work centre per day or week: what is committed, what is available, and where the plan is over capacity. Overload is shown before it becomes a missed shipment rather than after.

We support both an infinite view, where you see the overload and decide, and finite scheduling, where the engine will not place more work into a period than the calendar allows and pushes the remainder forward.

Shop-floor sequencing

For each work centre we produce a dispatch list: the operations queued, in the sequence the rules produce, with the job, quantity, due date and estimated run time. Sequencing rules are configurable — earliest due date, order priority, shortest setup, or grouping by setup family to avoid unnecessary changeovers. A planner can drag or re-rank the sequence manually, and the engine re-derives dates from the new order. Shop-floor users see the current dispatch list for their work centre in a Zoho Creator screen or a Sigma widget, and record start, pause and completion against it.

Capable-to-promise for sales

Because capacity and material availability are both modelled, we can answer the date question at the point of sale. A custom function callable from a Zoho CRM Deal or a Zoho Inventory Sales Order returns the earliest achievable date for a requested quantity, given current material, current load and lead times. That date is written back to the record so the salesperson quotes something the plant can actually hit.

Exceptions instead of reports nobody opens

A scheduled Deluge function raises exceptions rather than expecting anyone to read a plan every morning: an order that will be late, a component that will go negative on a specific date, a work centre over capacity in a given week, a purchase order that needs expediting. Exceptions are delivered as Zoho CRM tasks, email, or Zoho Cliq messages via Zoho Flow, assigned to the owner who can act on them.

Who this is for

Manufacturers who already have BOMs and work orders — whether from a prior ECOSIRE build or their own configuration — and whose constraint is now planning rather than recording. Make-to-order shops that must quote realistic dates. Businesses with long-lead-time components where late purchasing is the recurring failure. Plants with a small number of genuinely constrained machines where sequencing decides throughput.

This assumes a working BOM and work order model exists. If it does not, that is scoped first — a planning engine on top of no BOM has nothing to explode.

How delivery works

1. Scoping call. We establish your planning horizon and bucket, what counts as demand, whether you plan by warehouse or globally, your supplier lead times and order rules, which work centres are genuinely constrained, your shift calendars, and which sequencing rule reflects how the plant really decides.

2. Fixed quote. You receive a written scope covering the MRP logic, the capacity model, the sequencing rules, the exception matrix and the integration points, at a fixed price. The listed price is a starting point; the quote reflects the approved scope.

3. Build. We develop in a sandbox: the Creator planning application, Deluge MRP and scheduling logic, scheduled functions, Zoho Flow orchestration, REST API integration with Zoho Inventory and Zoho Books, and Sigma widgets for the load profile and dispatch list. Typical lead time is one working week, driven mainly by how many planning rules and constraints are in scope.

4. Install in test, then production. We install into your test org and run the plan against your own data — a real horizon of sales orders, real stock, real open POs — and compare the suggested purchase and work orders against what your planner would have decided manually. That comparison is the acceptance test. We tune the rules until the plan is trusted, then promote to production.

5. Support. Delivery includes configuration handover, planner and shop-floor training, and a defined support window for defect fixes and configuration adjustments. Additional constraints, new sequencing rules or further integrations are quoted separately.

The planning application, the Deluge logic, the flows and the documentation all live in your own Zoho org and keep running independently of ECOSIRE.

How delivery works

  1. 1

    Scoping call

    A short call to confirm the workflow, your platform version and where the integration boundaries sit.

  2. 2

    Fixed quote

    You receive a written scope and a fixed price. Nothing is built until you approve it.

  3. 3

    Build and test

    We develop against a copy of your configuration and test it there. Typically two to four weeks.

  4. 4

    Install and support

    نثبّت الحل على نظامك ونسلّمك الشيفرة المصدرية، ويشمل ذلك أسبوعين من الدعم بعد التشغيل. نصلح عيوب الكود الذي نسلّمه مجانًا.

ما تحصل عليه

  • Zoho Creator planning application containing the MRP workbench, capacity load screens and dispatch lists, installed in your org
  • Deluge MRP, backward-scheduling, capacity and sequencing logic together with the scheduled planning-run functions
  • REST API and Zoho Flow integration converting approved plan suggestions into Zoho Inventory Purchase Orders and work orders
  • Sigma widgets for the work centre load profile, the shop-floor dispatch list and the capable-to-promise lookup
  • Configuration of planning horizon and buckets, supplier lead times and order rules, work centre calendars, sequencing rules and the exception matrix, applied in test then production
  • Planning design documentation covering the netting logic, scheduling assumptions, sequencing rules and exception definitions
  • Planner and shop-floor training plus a defined post-go-live support window for defect fixes and configuration adjustments

لمن هذا

Production Planner

Rebuilds the plan in a spreadsheet every week from Zoho Inventory exports, and it is stale before the meeting ends. A repeatable MRP run with time-phased netting and planned order suggestions replaces the rebuild, and exceptions surface the handful of items that actually need a decision.

Purchasing Officer

Raises purchase orders reactively when stock runs out, which is always too late for long-lead-time components. Dated requirements derived from exploded demand, with lead time and minimum order quantity applied, give a buy list with required-by dates instead of a shortage list.

Sales Manager

Promises delivery dates with no visibility of material availability or machine load, then absorbs the fallout when a job slips. A capable-to-promise check callable from the Zoho CRM Deal returns a date the plant can support and writes it onto the record before the commitment is made.

كيف يقارن Production Planning and Capacity Scheduler.

المعيارECOSIREبناء مخصصمنافسZoho One الأصلي
Current on-hand stock visibility by warehouseمتضمنةمتضمنةمتضمنةمتضمنة
Time-phased netting of demand against supply across a horizonمتضمنةدعم جزئيمتضمنةغير متضمنة
Planned purchase orders respecting lead time, minimum order quantity and multiplesمتضمنةدعم جزئيمتضمنةغير متضمنة
Work centre calendars and finite capacity schedulingمتضمنةغير متضمنةدعم جزئيغير متضمنة
Shop-floor dispatch list with configurable sequencing rulesمتضمنةدعم جزئيدعم جزئيغير متضمنة
Capable-to-promise date returned onto a Zoho CRM Deal or Sales Orderمتضمنةغير متضمنةغير متضمنةغير متضمنة
Exception alerts for late orders, projected shortages and over-capacity periodsمتضمنةدعم جزئيدعم جزئيغير متضمنة
Operates inside your existing Zoho org with no separate planning platformمتضمنةمتضمنةغير متضمنةمتضمنة

الأسئلة المتداولة

When can we have this, and is anything ready to install now?
Nothing is pre-built or downloadable. We scope your planning model on a call, issue a fixed quote, and build after approval — typically one working week. The number of constrained work centres, how many sequencing and order rules are in scope, and how quickly we receive sandbox access and a representative demand horizon are what move the timeline within that range.
Which Zoho applications and editions does this require?
It needs Zoho Inventory for demand, stock and purchase orders, Zoho Creator to host the planning application and screens, and Zoho Flow for orchestration and notifications. Zoho Books is required if planned purchase orders must flow into your financial process, and Zoho CRM is needed for the capable-to-promise lookup on Deals. Plan tier affects custom function limits, scheduled function frequency and API call volume, which matter for a nightly planning run — we confirm what your subscription supports during scoping and tell you before quoting if a change is needed.
Do we need BOMs and work orders in place before this can work?
Yes. MRP explodes demand through a bill of material, and capacity scheduling loads operations onto work centres, so both structures must exist. If your Zoho org already has a working BOM and work order model we plan on top of it. If it does not, that foundation is scoped and quoted first — a planning engine with nothing to explode produces nothing useful.
How often does the plan run, and can we run it on demand?
Both. A scheduled Deluge function runs the plan on the cadence you choose, commonly nightly, and planners can trigger an on-demand run from the Creator workbench after a large order or a supply change. Each run is stored with its inputs so you can compare plan versions and see what changed between them.
Does the system release purchase orders and work orders automatically?
Only if you configure it that way, and we do not recommend it for the first cycles. The default is that the plan produces suggestions a planner reviews and approves in the Creator workbench, and approved suggestions are then created in Zoho Inventory through the REST API. Auto-release can be enabled later for specific item classes once you trust the plan output.
What if the plan disagrees with what our planner would do?
That is the acceptance test, not a problem to discover later. During the test-environment phase we run the engine against your real horizon and compare its suggestions with the decisions your planner would have made manually, then tune the rules — lead times, safety stock, sequencing priority, capacity assumptions — until the output is trusted. We do not promote to production on an untuned plan.

طلب عرض سعر

أخبرنا باحتياجاتك من Production Planning and Capacity Scheduler وسنرسل لك الأسعار وخيارات الترخيص وعرضًا مخصصًا، عادةً خلال يوم عمل واحد.

لا حاجة للدفع الآن. يؤدي هذا إلى إرسال طلب عرض سعر إلى فريقنا — وسنتواصل معك عبر البريد الإلكتروني بالأسعار والخطوات التالية.

أزواج بشكل جيد مع

Legal Case and Matter Management Application
تطوير حسب الطلب

Legal Case and Matter Management Application

A build-to-order Zoho Creator application for law firms covering matters, hearings, time capture, billing and document sets, integrated with Zoho Books. Built for your firm after a fixed quote.

من $999.00نقطة البداية — يُحدَّد السعر وفق نطاق عملك
View specification
Manufacturing BOM and Work Order Suite
تطوير حسب الطلب

Manufacturing BOM and Work Order Suite

A build-to-order manufacturing layer for Zoho Inventory and Zoho Books: multi-level BOMs, routings, work orders and real production costing. Scoped, built and installed by ECOSIRE.

من $999.00نقطة البداية — يُحدَّد السعر وفق نطاق عملك
View specification
Real Estate and Property Management Application
تطوير حسب الطلب

Real Estate and Property Management Application

A build-to-order property and lease management application on Zoho Creator, wired to Zoho CRM and Zoho Books so units, leases, rent runs and maintenance live in one system. ECOSIRE builds it for your portfolio after a fixed quote.

من $999.00نقطة البداية — يُحدَّد السعر وفق نطاق عملك
View specification
Restaurant Operations Management Application
تطوير حسب الطلب

Restaurant Operations Management Application

A Zoho Creator application for multi-outlet food businesses covering recipe costing, wastage, central-kitchen transfers and delivery-aggregator reconciliation into Zoho Books. Built to order for your menu and outlet structure.

من $999.00نقطة البداية — يُحدَّد السعر وفق نطاق عملك
View specification