A build-to-order Business Central (AL) extension that calculates store-level replenishment proposals and allocates warehouse stock to stores using sales velocity, min/max, seasonality and size curves — installed as a per-tenant extension and supported by ECOSIRE. Built to order by ECOSIRE for Dynamics 365 BC (build-to-order) — indicative price from $499.00 USD; request a quote for a scoped proposal.
应用清单
围绕您的工作流程构建
A build-to-order Business Central (AL) extension that calculates store-level replenishment proposals and allocates warehouse stock to stores using sales velocity, min/max, seasonality and size curves — installed as a per-tenant extension and supported by ECOSIRE.
无需自行搭建——由 ECOSIRE 构建、安装并提供支持的可用应用。
以一次性构建价格开始。我们在启动时与您共同确定范围。
ECOSIRE 在您的 Dynamics 365 Business Central 上构建、配置并安装。
约 2–4 周内上线,并提供上线后的支持期。
Multi-store retailers waste cash on overstocked stores while bestsellers sit empty elsewhere. Retail Replenishment & Allocation is a Microsoft Dynamics 365 Business Central extension, written in AL and installed as a per-tenant extension on your own BC environment, that turns demand signals into concrete transfer orders.
The extension reads sales velocity from Item Ledger Entry and Value Entry, applies per-location min/max and safety-stock settings, and generates store-level replenishment proposals on a worklist page. For push allocation, it fairly distributes constrained DC stock across stores by demand share; for pull, each store requests to its target. Fashion retailers get size-curve allocation that respects ratio profiles per style. Approved proposals generate native Transfer Orders automatically, so receiving, in-transit tracking and bin logic all stay in standard BC.
Because it is build-to-order, ECOSIRE tailors the calculation engine to your hierarchy (channel, region, store cluster, item category), wires seasonality curves and lead times to your data, and ships dedicated permission sets. Heavy runs are scheduled through the Job Queue; proposals and allocations are exposed over the BC REST/OData v4 API for Power BI and Power Platform. Optional event subscribers let downstream apps react when a transfer is created.
This is not an instant AppSource download. ECOSIRE scopes, builds, installs and supports the extension on your tenant or on-premises BC, with source handed over and a documented data model. You get a clean, upgrade-safe extension (table/page extensions, no base-app modification) that survives Microsoft's continuous updates and that your own AL team — or ours — can extend later.
Owns store-level stock targets and wants replenishment proposals driven by real sell-through instead of manual spreadsheets, with bulk approve and override on one worklist.
Decides how to split constrained DC inventory across stores. Needs fair push allocation by demand share and size-curve logic so fashion ranges land complete per store.
Responsible for an upgrade-safe tenant. Values a per-tenant extension with no base-app changes, clean permission sets, Job Queue scheduling and documented OData endpoints.
| 标准 | 伊科西尔 | 定制建造 | 竞争对手 | 奥杜本机 |
|---|---|---|---|---|
| Store-level replenishment by sales velocity (min/max + safety stock) | 包含 | 部分支持 | 部分支持 | |
| Push allocation of constrained DC stock by demand share | 包含 | 部分支持 | 部分支持 | |
| Size-curve / ratio allocation for fashion and footwear | 包含 | 部分支持 | 部分支持 | |
| Automatic native Transfer Order generation from proposals | 包含 | 部分支持 | 部分支持 | |
| Tailored to your store hierarchy, clusters and seasonality | 包含 | 包含 | 不包括在内 | |
| Upgrade-safe per-tenant extension, no base-app modification | 包含 | 部分支持 | 包含 | |
| Full AL source handed over plus ECOSIRE build & support | 包含 | 部分支持 | 不包括在内 | |
| OData/REST API + Power BI / Power Platform integration | 包含 | 部分支持 | 部分支持 |
No — this is build-to-order, not an instant AppSource download. ECOSIRE scopes, builds, installs and tests the extension on your Business Central environment. Typical delivery is about 3 to 6 weeks depending on the complexity of your store hierarchy, size-curve rules and seasonality requirements. We start in your sandbox, validate proposals against real history, then deploy the per-tenant extension to production with you.
You receive the full AL source plus a warranty period for defect fixes. ECOSIRE offers ongoing support and enhancement retainers, and because the extension uses table/page extensions and event subscribers with no base-application changes, it is upgrade-safe across Microsoft's continuous Business Central updates. When a major BC release ships, we revalidate and recompile against the new runtime; your team can also extend the code independently.
Yes. It is built as a per-tenant extension, which installs on BC online (SaaS) tenants and on-premises deployments alike. For SaaS we deploy via the admin center and your sandbox-to-production promotion; for on-premises we install against your service tier. Heavy runs use the Job Queue in both cases.
No base objects are modified. The extension reads from standard ledgers (Item Ledger Entry, Value Entry) and writes its output as native Transfer Orders, so receiving, in-transit tracking, bins and warehouse logic remain exactly as Business Central handles them today. Planners interact through added worklist pages; everything downstream stays standard.
Yes. Proposals, allocations and run results are exposed through API pages over the BC REST/OData v4 endpoints, so you can build Power BI dashboards or trigger Power Automate flows and Dataverse syncs. We configure the endpoints and document them as part of delivery.
A build-to-order Business Central (AL) extension that calculates store-level replenishment proposals and allocates warehouse stock to stores using sales velocity, min/max, seasonality and size curves — installed as a per-tenant extension and supported by ECOSIRE.